• Phase 1 (planner_reviewer review gate + P0 resume-bug fix) shipped as
    ea19c7d, matching org-graph-unification-phase1-review-gate-design.md
    exactly (new task.status value, org role, _REQUIRED_ARTIFACTS narrowing,
    both bugs fixed). Moving that design doc and the P0 bug doc it subsumed
    to docs/done/, updating their status headers, and fixing the doc-path
    references left pointing at their old docs/todo/ location across
    agents/planner_reviewer/{SOUL,AGENTS}.md, src/schema.py migration
    docstrings, and the other Phase 2/deblackbox docs. Full suite green
    (731 tests) both before and after.
    
    Also ran Phase 2 SDD's §9 interface-reconciliation checklist against the
    real Phase 1 implementation now that it exists for real: all three items
    check out (run_id is included in plan_and_review_documents()'s return
    shape, the new task.status value is exactly reviewing_planner_output as
    assumed, and planner_reviewer's role.json doesn't pre-reserve a skill
    slot for Phase 2's new skill, which is fine -- a one-line addition when
    Phase 2c lands, not an incompatibility). Updated §9 to reflect this.
    
    Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
    bboonnee authored
     
    Browse File »