-
Removed the "disabled" framing from docs/done/validator-test-script- narrative-output-issue.md (moved todo/ -> done/, root cause identified, structural fix landed, spot-check clean) -- the mechanism it described (_CANONICAL_DOC_CHAIN, e2e_pipeline._VALIDATOR_MANIFEST) no longer exists in production code, superseded by the 2026-08-08 self-planning rewrite and Org Graph unification Phase 2. Planner's and Validator's self-planning catalogs already carry test_script as a suggested (not required) option; _CODER_NODE_CATALOG was the one gap -- added a matching entry there (mechanical check_script_compiles judgment, same as Validator's). All three org agents now decide per-goal whether this node is worth planning, with no remaining "this node type is globally off" switch anywhere. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
-
org-graph-unification-and-universal-self-planning-requirements.md, org-graph-unification-phase2-universal-self-planning-design.md, scheduler-new-goal-dispatch-requirements.md, and work-graph-node-execution-deblackbox-requirements.md all moved docs/todo/ -> docs/done/ (already done in earlier commits via git mv) -- this fixes the remaining docs/todo/ path references to these four files across the docs that cross-link them. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
-
Phase 1 (planner_reviewer review gate + P0 resume-bug fix) shipped as ea19c7d, matching org-graph-unification-phase1-review-gate-design.md exactly (new task.status value, org role, _REQUIRED_ARTIFACTS narrowing, both bugs fixed). Moving that design doc and the P0 bug doc it subsumed to docs/done/, updating their status headers, and fixing the doc-path references left pointing at their old docs/todo/ location across agents/planner_reviewer/{SOUL,AGENTS}.md, src/schema.py migration docstrings, and the other Phase 2/deblackbox docs. Full suite green (731 tests) both before and after. Also ran Phase 2 SDD's §9 interface-reconciliation checklist against the real Phase 1 implementation now that it exists for real: all three items check out (run_id is included in plan_and_review_documents()'s return shape, the new task.status value is exactly reviewing_planner_output as assumed, and planner_reviewer's role.json doesn't pre-reserve a skill slot for Phase 2's new skill, which is fine -- a one-line addition when Phase 2c lands, not an incompatibility). Updated §9 to reflect this. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>