• create_task(): validates goal_text/project_id/task_type (INVALID_PARAM per
    03-C §3.1), inserts the task row (status=queued, assigned_org_node=planner,
    loop_round=0 -- 04-P p_org_task_lifecycle start_state) plus a
    task_status_changed execution_event, both in one transaction (explicit
    rollback on failure between the two inserts, tested by dropping
    execution_event mid-call). c_project_create isn't reimplemented -- it's
    already complete in U-002 (project_scaffold.create_project).
    
    Corrects another Done-line overreach found while scoping this Unit:
    development-plan.md claimed U-009 alone satisfies all three REQ-01 cases
    (happy/boundary/failure), but the happy case ("依次触发 planner/coder/
    validator...task.status 按状态机正确流转") needs c_org_node_trigger's full
    implementation -- U-010's own Done criterion is almost that exact sentence,
    and U-009 doesn't depend on U-010 or even touch org-node triggering. Same
    class of issue as the U-002/U-036 corrections earlier this session (an
    SDD/plan line claiming more than the Unit's actual dependencies support),
    judged low-stakes enough (doesn't change what code to write, just when the
    REQ-01 happy case gets marked satisfied) to fix directly rather than stop
    and ask, per the graduated caution this session has been using. Boundary
    (concurrency limit doesn't block task *creation*, only later scheduling)
    and failure (INVALID_PARAM) are both fully real at U-009's scope and
    tested; happy completes cumulatively once U-010 lands.
    
    12 new stdlib unittest cases. 75 total across U-001-009, all passing.
    
    Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
    bboonnee authored
     
    Browse Dir »
  • Resolves the A-2 assumption with a real `claude --agent planner -p` call
    (--permission-mode auto, $0.05) against a deployed target project: the
    migrated identity comes through correctly, not the default assistant
    persona. Verdict is "部分成立" (partially confirmed), per the criterion
    development-plan.md's U-004 line pre-registered for exactly this outcome --
    Planner/Validator's SOUL.md migrated almost verbatim, but Coder's SOUL.md
    needed real rewriting: the original hardcoded a live Feishu Base API token
    (redacted, never committed), strongly bound its task-claiming to
    `lark-cli`/Base status vocabulary, and told itself to shell out
    `claude --dangerously-skip-permissions` (conflicts directly with 05
    §5.3.1's `auto`-mode decision). All three replaced with graphlemon's own
    task table / c_org_node_trigger / task.status vocabulary.
    
    Also resolves a second, higher-stakes conflict found while scoping this
    Unit: where does `.claude/agents/<org_node>.md` actually live? Architecture
    doc §13.1 says graphlemon's own platform repo; 03-C §3.3 and 05 §5.1 (both
    core SDD, not the architecture PRD) explicitly say the target project --
    matching how Claude Code's --agent flag actually discovers subagents
    (relative to invocation cwd). User confirmed 03-C/05 win. Resolved as two
    different files, not a contradiction: agents/<org_node>/SOUL.md (+
    validator/AGENTS.md) here is the canonical migrated source (01-M 1.9
    agent_profile.soul_file_path, a singleton with no target-project
    reference); src/agent_profile.py compiles that into the deployable
    .claude/agents/<org_node>.md and writes it into a target project via
    deploy_agent_definitions(). Does not reopen the U-002 correction from the
    previous commit -- .graphlemon/ scaffolding and agent deployment are
    different, non-conflicting concerns.
    
    validator's tools/disallowedTools frontmatter encodes qa/AGENTS.md's
    original workspace-permission contract (read-only on source, no git
    mutation commands) as actual Claude Code permissions instead of prose.
    
    14 new stdlib unittest cases (test_agent_profile.py, all real) + 1 gated
    real-agent test (test_agent_e2e.py, RUN_REAL_AGENT_E2E=1, mirrors
    graphloop's pattern per CLAUDE.md's Testing constraint -- this is the first
    Unit that actually shells out to `claude`, so this is also where that
    harness gets built, per the harness-ownership decision from the earlier
    "什么还需要" review). 41 total tests across U-001-004, all passing.
    
    Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
    bboonnee authored
     
    Browse Dir »
  • Implements c_project_create (03-C §3.0) as a plain function for U-007 to
    wire up later: idempotent by target_folder_path, creates .graphlemon/ +
    one init commit in an existing git repo, PATH_NOT_FOUND/PATH_NOT_WRITABLE/
    GIT_INIT_DECLINED per contract, never silently `git init`s (02-V §2.1).
    
    Also corrects a real SDD-vs-plan conflict found while scoping this Unit:
    development-plan.md's U-002 line cited architecture doc §7.3's directory
    tree (.claude/agents/, skills/, top-level runs/) as what to create inside
    a target project. But §13.1 (a later, confirmed decision) states those are
    graphlemon's own platform-repo assets (U-003 scope), and 01-M's own
    graphlemon_subdir_initialized field already points at §13.2, whose target-
    project tree is only .git/ + .graphlemon/ + the target's pre-existing
    src/. §7.3 predates the "target project is an independent code space"
    pivot and was superseded by it. Corrected development-plan.md,
    unit_matrix.json, CLAUDE.md, and 05-实施约束与依赖.md accordingly (user
    confirmed, 2026-07-31).
    
    23 stdlib unittest cases (src/test_schema.py + new src/test_project_scaffold.py),
    all passing.
    
    Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
    bboonnee authored
     
    Browse Dir »

  • Establishes the first commit for graphlemon before U-001 work begins:
    architecture/SDD docs (including the PH5 self-hosting design already
    folded into 01-M/03-C/04-P/mvcp-contract v1.7.0), the A-1 spike results,
    the graphloop-adapted supervisor/isolation utilities, PH3 wireframe
    prototypes (now cross-referenced from 02-V), and this session's
    development-plan review (U-024 dependency split, U-035 regression
    requirement, new U-004.5 e2e-harness unit, src/ directory convention).
    
    Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
    bboonnee authored
     
    Browse Dir »