-
Phase 1 (planner_reviewer review gate + P0 resume-bug fix) shipped as ea19c7d, matching org-graph-unification-phase1-review-gate-design.md exactly (new task.status value, org role, _REQUIRED_ARTIFACTS narrowing, both bugs fixed). Moving that design doc and the P0 bug doc it subsumed to docs/done/, updating their status headers, and fixing the doc-path references left pointing at their old docs/todo/ location across agents/planner_reviewer/{SOUL,AGENTS}.md, src/schema.py migration docstrings, and the other Phase 2/deblackbox docs. Full suite green (731 tests) both before and after. Also ran Phase 2 SDD's §9 interface-reconciliation checklist against the real Phase 1 implementation now that it exists for real: all three items check out (run_id is included in plan_and_review_documents()'s return shape, the new task.status value is exactly reviewing_planner_output as assumed, and planner_reviewer's role.json doesn't pre-reserve a skill slot for Phase 2's new skill, which is fine -- a one-line addition when Phase 2c lands, not an incompatibility). Updated §9 to reflect this. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>