Phase 1 (planner_reviewer review gate + P0 resume-bug fix) shipped as
ea19c7d, matching org-graph-unification-phase1-review-gate-design.md
exactly (new task.status value, org role, _REQUIRED_ARTIFACTS narrowing,
both bugs fixed). Moving that design doc and the P0 bug doc it subsumed
to docs/done/, updating their status headers, and fixing the doc-path
references left pointing at their old docs/todo/ location across
agents/planner_reviewer/{SOUL,AGENTS}.md, src/schema.py migration
docstrings, and the other Phase 2/deblackbox docs. Full suite green
(731 tests) both before and after.
Also ran Phase 2 SDD's §9 interface-reconciliation checklist against the
real Phase 1 implementation now that it exists for real: all three items
check out (run_id is included in plan_and_review_documents()'s return
shape, the new task.status value is exactly reviewing_planner_output as
assumed, and planner_reviewer's role.json doesn't pre-reserve a skill
slot for Phase 2's new skill, which is fine -- a one-line addition when
Phase 2c lands, not an incompatibility). Updated §9 to reflect this.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>