The planner workflow (graphlemon Work Node) finished. Summary:
Task: Add a comment above _LOOP_LIMIT = 3 in src/org_loop_route.py explaining the REQ-05/REQ-09 loop-round boundary behavior.
Finding: The planner re-read the file and confirmed the comment already exists verbatim at line 38, exactly matching what was requested (REQ-05/REQ-09 reference, loop_round >= _LOOP_LIMIT boundary, blocked_pending_human trigger). This matches an existing memory entry (project_loop_round_bug_already_fixed) confirmed on 2026-08-02 and again today.
Outcome: No BRD/Development Unit generated — the planner recommends marking this task as already satisfied rather than producing a redundant/no-op diff, and flags that if the pipeline requires a code diff to consider a task "done," that's a process question for a human, not something to fake with a spurious change.
No code was modified. Let me know if you want to look into that process question (whether "confirmed already done" should be a valid terminal state) or move on to something else.