The planner work node finished — it produced a PRD v2 for the new Graph page (Org Graph / Work Graph visualization + output overview), building on the previously approved BRD. Key points from the PRD: - New page: `v_graph_console` at route `#/graph` (kept distinct from the existing `v_graph_visualizer` component embedded in `v_task_detail`, to avoid naming collision). - FR-1: New Org Graph topology renderer showing the 3 fixed nodes (planner/coder/validator) with flow + retry-loop edges, replacing reliance on the existing `org-strip`. - FR-2/3: Work Graph rendering reuses existing `computeGraphLayers`/`renderGraphVisualizerPanel`, adds a task switcher, and reuses the existing WebSocket event flow for live updates. - FR-4 (the core fix in this revision): Click-to-expand-logs is implemented as an opt-in parameter (`enableNodeClick`/`onNodeClick`) on the shared rendering functions, so `v_task_detail`'s existing hover-only behavior is explicitly guaranteed to stay unchanged — this resolves a contradiction flagged by consistency review in the prior draft (v1 implied both "shared code" and "v_task_detail unaffected" without a mechanism to reconcile them). - FR-5: An "artifacts overview" panel (docs/code/graph-run-history/tasks) done as summary + "view all" links to existing pages, rather than reimplementing filtering — one new backend endpoint needed: `GET /api/work-graph-runs`. - Includes updated acceptance criteria (AC-1–AC-6), test scenarios, and a suggested `docs/sdd/02-V-界面与交互.md` §2.7.2 addition. This is planner-stage output only (no code was written, consistent with the planner agent's role) — next step would be the SDD stage or handing this PRD to the Coder.