The planner workflow (graphlemon Work Node) finished. Summary: **Task**: Add a comment above `_LOOP_LIMIT = 3` in `src/org_loop_route.py` explaining the REQ-05/REQ-09 loop-round boundary behavior. **Finding**: The planner re-read the file and confirmed the comment already exists verbatim at line 38, exactly matching what was requested (REQ-05/REQ-09 reference, `loop_round >= _LOOP_LIMIT` boundary, `blocked_pending_human` trigger). This matches an existing memory entry (`project_loop_round_bug_already_fixed`) confirmed on 2026-08-02 and again today. **Outcome**: No BRD/Development Unit generated — the planner recommends marking this task as already satisfied rather than producing a redundant/no-op diff, and flags that if the pipeline requires a code diff to consider a task "done," that's a process question for a human, not something to fake with a spurious change. No code was modified. Let me know if you want to look into that process question (whether "confirmed already done" should be a valid terminal state) or move on to something else.